—Advertisement—

CASE STUDY: Hazelwood School, Glasgow, Scotland, Gordon Murray + Alan Dunlop Architects

Building good schools in tough times
With school enrollment projected to increase at record levels through 2013, spending on school construction, renovation and maintenance was expected to total nearly $30 billion annually. Yet, economic times are much tougher now, and making good design decisions has never been more difficult or more important. To find out how to do more with less, architects, school board members and administrators must attend the Schools of the 21st Century Symposium. It will be held April 3, the day before the NSBA Conference at the Marriott San Diego Hotel and Marina. The event is free of charge and will be presented by Architectural Record with the support of McGraw-Hill Education and the American Architectural Foundation.

Click here for more information.
—Advertising—
Product Profiles
 
 

<< Return to case study index | << Return to full story

Credits

Completion Date
August 2007

Gross square footage
28696.585 square feet

Total construction cost
£6.8million

Owner
Glasgow City Council

Architect
Gordon Murray + Alan Dunlop Architects
Breckenridge House
274 Sauchiehall Street
Glasgow
G2 3EH
phone: 0141 331 2926
fax: 0141 332 6790
mail@murraydunloparchitects.com
www.murraydunloparchitects.com

Architecture Project Team:
Alan Dunlop (partner), Stacey Phillips (project director), Fergal feeney (Architect)
(architects and interior designers)

Engineer(s):
Buro Happold

Consultant(s)
Landscape:
City Design Co-operative

Lighting:
Buro Happold

Acoustical:
RMP Acoustic Consultants

General contractor:
Sir Robert McAlpine

Photographer
Andrew Lee : +44 141 4453799
Keith Hunter: +44 141 8864503

Renderer(s):
Gordon Brown, GM+AD Architects

Software used:
AutoCAD: Drawing Package; 3D Viz: 3D modeling

 

Product Specification

Structural System
Glu-Lam Timber Frame : BS Holz

Exterior cladding
Wood: Siberian Larch timber weatherboarding by Swift Horsemen (sub-contractor)

Roofing
Metal: Zinc Standing Seam by VM Zinc

Windows
Wood: By Scandinavian Window Systems LTD

Glazing
Glass: Toughened and Laminated Glass roof:  Haran Glass LTD

Skylights: Marvault rooflights by Brett Martin Daylight systems LTD

Doors
Entrances: Part of Glazed Screen by Scandinavian Window Systems ltd.

Wood doors: By Leaderflush LTD

Hardware
Locksets: Allgood PLC

Hinges: Allgood PLC

Closers: Allgood PLC

Exit devices: Allgood PLC

Pulls: Allgood PLC

Cabinet hardware: Hafele Ltd

Interior finishes
Acoustical ceilings: Rigitone Board by British Gypsum

Suspension grid: British Gypsum

Sliding partitions: Movawall systems LTD

Cabinetwork and custom woodwork: Sensory Wall made by Elmwood Glasgow LTD

Plastic laminate: Suprema vinyl floor covering by Altro

Special surfacing: Natural Cork Tiles (Sensory Wall)

Carpet: Floor tile by Heckmondwike FB

Lighting  
all lighting by N G Bailey & Company Limited (sub – contractor)

 

<< Return to case study index | << Return to full story

— Advertisement —