CASE STUDY: Alpine School District Prototype Middle Schools, Alpine and Lehi, Utah
With school enrollment projected to increase at record levels through 2013, and spending on school construction, renovation and maintenance expected to total nearly $30 billion annually, the need to transform our schools has never been more urgent. To learn how you can help schools make better design decisions, attend the Schools of the 21st Century Symposium on March 28, 2008, in Orlando, Florida. The event is presented by Architectural Record with the support of McGraw-Hill Education and the American Architectural Foundation.
Click here for more information
Product Profiles
<< Return to case study index | << Return to full story
Credits
Completion date
Timberline Middle School—fall 2004
Willowcreek Middle School—fall 2005
Gross square footage
180,000 (each school)
Total construction cost
$17,500,000.00
Owner
Alpine School District
575 North 100 East
Ameican Fork, UT 84003
Architect
VCBO Architecture
524 South 600 East
Salt Lake City, UT 84102
T (801) 575-8800
F (801) 531-9850
Team:
Steve H. Crane, FAIA: Principal in Charge
Vern Latham, AIA: Project Manager
Boyd McAllister, AIA: Project Designer
Jeanne Jackson, AIA: Project Designer
Architect of record
VCBO Architecture
Interior designer
VCBO Architecture
Engineer(s)
Structural:
Bsumek Mu & Associates P.C.
345 South 400 East
Salt Lake City, UT 84111
Mechanical:
Van Beorum & Frank
330 South 300 East
Salt Lake City, UT 84111
Electrical:
BNA Consulting Engineers II
635 South State Street
Salt Lake City, UT 84111
Consultant(s)
Landscape:
Ensign Engineering
90 E. Fort Union Blvd., Suite 100
Midvale, UT 84047
Lighting:
VCBO Architecture
524 South 600 East
Salt Lake City, UT 84102
Acoustical:
Spectrum Engineers
175 S. Main Street, Suite 300
Salt Lake City, UT 84111
General contractor
Hogan and Associates
940 North 1250 West
Centerville, Utah 84014
Photographer(s)
VCBO Architecture
524 South 600 East
Salt Lake City, UT 84102
(801) 575-8800
Dana Sohm
801) 450-1947
Renderer(s)
VCBO Architecture
524 South 600 East
Salt Lake City, UT 84102
CAD system, project management, or other software used
Auto Cad; 3D Modeling
Product Specification
Structural system
Masco, Inc.
462 S 675 W
Centerville, UT 84014
Exterior cladding
Masonry:
Buehner Block Co
2800 S West Temple
Salt Lake City, UT 84115 - 3504
Metal/glass curtainwall:
United States Aluminum
3663 Bandini Boulevard
Los Angeles, CA 90023
Metal cladding: Fabral,
Roofing
Elastomeric: Sarnafil
Windows
Aluminum: United States Aluminum
Glazing
Skylights: Kalwall
Doors
Entrances: United States Aluminum
Metal doors: Mollerup Glass Company
Wood doors: VT Industries
Hardware
Locksets: Upublic
Hinges: Schlage
Closers: LCN
Exit devices: Precision
Interior finishes
Cabinetwork and custom woodwork: Huetter Mill & Cabinet
Paints and stains: Kwall-Howells
Plastic laminate: Wilsonart International
Floor and wall tile: Dal-Tile Corporation
Carpet: Lee’s Faculty
Furnishings
Auditorium seating: Hussey
Lockers: Republic Storage Systems
Bleachers: Hussey Seating Company
Conveyance
Elevators/Escalators: ThysenKrupp
Plumbing
American Standard
