—Advertisement—

CASE STUDY: Alpine School District Prototype Middle Schools, Alpine and Lehi, Utah

Be a part of building schools of the future
With school enrollment projected to increase at record levels through 2013, and spending on school construction, renovation and maintenance expected to total nearly $30 billion annually, the need to transform our schools has never been more urgent. To learn how you can help schools make better design decisions, attend the Schools of the 21st Century Symposium on March 28, 2008, in Orlando, Florida. The event is presented by Architectural Record with the support of McGraw-Hill Education and the American Architectural Foundation.
Click here for more information
—Advertising—
Product Profiles
 
 

<< Return to case study index | << Return to full story

Credits

Completion date
Timberline Middle School—fall 2004
Willowcreek Middle School—fall 2005

Gross square footage
180,000 (each school)

Total construction cost
$17,500,000.00

Owner
Alpine School District
575 North 100 East
Ameican Fork, UT 84003  

Architect
VCBO Architecture
524 South 600 East
Salt Lake City, UT 84102 
T (801) 575-8800
F (801) 531-9850

Team:
Steve H. Crane, FAIA: Principal in Charge
Vern Latham, AIA: Project Manager
Boyd McAllister, AIA: Project Designer
Jeanne Jackson, AIA: Project Designer

Architect of record
VCBO Architecture

Interior designer
VCBO Architecture

Engineer(s)
Structural:
Bsumek Mu & Associates P.C.
345 South 400 East
Salt Lake City, UT 84111

Mechanical:
Van Beorum & Frank
330 South 300 East
Salt Lake City, UT 84111

Electrical:
BNA Consulting Engineers II
635 South State Street
Salt Lake City, UT 84111

Consultant(s)
Landscape:
Ensign Engineering
90 E. Fort Union Blvd., Suite 100
Midvale, UT 84047

Lighting:
VCBO Architecture
524 South 600 East
Salt Lake City, UT 84102

Acoustical:
Spectrum Engineers
175 S. Main Street, Suite 300
Salt Lake City, UT 84111

General contractor
Hogan and Associates
940 North 1250 West
Centerville, Utah 84014

Photographer(s)
VCBO Architecture
524 South 600 East
Salt Lake City, UT 84102
(801)  575-8800
Dana Sohm
801) 450-1947

Renderer(s)
VCBO Architecture
524 South 600 East
Salt Lake City, UT 84102

CAD system, project management, or other software used
Auto Cad; 3D Modeling

Product Specification

Structural system
Masco, Inc.
462 S 675 W
Centerville, UT 84014

Exterior cladding
Masonry:
Buehner Block Co
2800 S West Temple
Salt Lake City, UT 84115 - 3504

Metal/glass curtainwall:
United States Aluminum
3663 Bandini Boulevard
Los Angeles, CA 90023

Metal cladding: Fabral,

Roofing
Elastomeric: Sarnafil

Windows
Aluminum: United States Aluminum

Glazing
Skylights: Kalwall

Doors
Entrances: United States Aluminum

Metal doors: Mollerup Glass Company

Wood doors: VT Industries

Hardware
Locksets: Upublic

Hinges: Schlage

Closers: LCN

Exit devices: Precision

Interior finishes
Cabinetwork and custom woodwork: Huetter Mill & Cabinet

Paints and stains: Kwall-Howells

Plastic laminate: Wilsonart International

Floor and wall tile: Dal-Tile Corporation

Carpet: Lee’s Faculty

Furnishings
Auditorium seating: Hussey

Lockers: Republic Storage Systems

Bleachers: Hussey Seating Company

Conveyance
Elevators/Escalators: ThysenKrupp

Plumbing
American Standard

<< Return to case study index | << Return to full story

— Advertisement —