With school enrollment projected to increase at record levels through 2013, spending on school construction, renovation and maintenance was expected to total nearly $30 billion annually. Yet, economic times are much tougher now, and making good design decisions has never been more difficult or more important. To find out how to do more with less, architects, school board members and administrators must attend the Schools of the 21st Century Symposium. It will be held April 3, the day before the NSBA Conference at the Marriott San Diego Hotel and Marina. The event is free of charge and will be presented by Architectural Record with the support of McGraw-Hill Education and the American Architectural Foundation.
Click here for more information.
Product Profiles
<< Return to case study index | << Return to full story
Credits
Completion Date
Phase 1, Fine/Performing Arts, Fall 2005
Phase 2, Media Arts/Communication Arts, Fall 2006
Gross square footage
286,219 sq. ft.
Total construction cost
$72.4M
Owner
Detroit Public Schools
Architect
Hamilton Anderson Associates
1435 Randolph, Suite 200
Detroit, MI 48226
P 313-964-0270
F 313-964-0170
Team:
Rainy Hamilton Jr., AIA, NOMA - President, Principal in Charge
Kent Anderson, ASLA - Vice President
David Esparza, AIA, LEED AP - Project Manager
Tom Sherry, AIA, LEED AP - Vice President of Design, Design Lead
Paul Locher, AIA, LEED AP - Project Architect
Paul Weidl, AIA - Design Architect
Bob Rudowski, AIA - Architect
Alicia Bayley, AIA – Architect
James Singleton – Designer
Andrea Glos, IIDA, ARIDO - Interior Designer
Burke Jenkins - Landscape Architect
Matt Taylor - Designer
Tracie Withrow - Field Representative
Frank Callis, R.A. - Architect
Christopher Orlando - Designer
Doug Barnes, R.A. - Specifications
Interior designer
Hamilton Anderson Associates
Engineer(s)
Structural:
L&A Structural Engineers
MEP: Albert Kahn Associates
Consultant(s)
Landscape & Civil: Hamilton Anderson Associates
Acoustical: Kirkegaard Associates
Theatrical: Schuler & Shook
Cost Modeling: Kirk Associates
Food Service: Stephen Bangs Associates, Inc.
Broadcast Telecommunication Design: Archteck
Vertical Transportation: Technical Inspections, Inc.
Commissioning: Peter Basso Associates
Technology Consultant: Swiderski Electronics Inc.
Construction Manager
L.S. Brinker / Skanska Building USA - Joint Venture
Photographer(s)
Balthazar Korab Ltd.
P.O. Box 895
Troy, MI 48098
P 248-641-8881
Clayton Studios
1423 Franklin
Detroit, MI 48207
P 313-567-3897
Jeff Kosro
5754 Bridgeview
West Bloomfield, MI 48322
P 313-550-8249
CAD system, project management, or other software used
ACAD 2000; Autodesk 3D Studio Viz
Product Specification
Structural system
Substructure: Spread and pad concrete footings for auditorium area (area 1) and a 3’-6” thick concrete mat foundation for the six story high school portion (areas 1 & 2). Concrete by Koenig Fuel & Supply, Detroit
Superstructure: Steel brace frame with composite metal and concrete floor and roof deck. Structural steel by Ross Steel, Detroit
Exterior cladding
Masonry:
- 8”x 24”x 4” pigmented CMU veneer w/ 8”x 8”x 16” & 8”x 8”x 24” pigmented & gray CMU back-up by Fendt Building Supply
- 2” rigid cavity insulation by Dow Corning
Metal/glass curtain wall:
- 2” flat insulated embossed steel panels by Centria
- 2” profiled insulated embossed steel panels (DS60) by Centria
- Both metal panel systems are on backup tube steel framing
- Kawneer 2250 Series aluminum curtain wall and door system
- Aluminum sunshade by Centria
- Metal louvers by Airolite Company and Centria
Wood:
- FSC Certified maple flooring by Baillie Lumber Co.
- FSC Certified maple veneered paneling by Columbia Forest Products
- FSC Certified Douglas Fir 2 x 4 & ¾” plywood by Certified Wood Products
Roofing
Built-up roofing:
- SBS modified bituminous membrane roofing by Firestone Building Products
- Aluminum Fiber Roof Coating (Energy Star high reflective coating) by Firestone Building Products
Green Roof:
Hydrotech extensive garden roof system.
Glazing
Glass:
- Clear insulated glass: Viracon VE 1-40 argon filled insulated glass
- Tinted insulated glass: Viracon Solarscreen 2000 argon filled blue-green insulated glass
- Translucent curtain wall glass: Solera by Advanced Glazing Limited Sydney, Nova Scotia
Skylights
Translucent skylight: Major Industries, Wausau, WI
Doors
Metal doors: Hollow metal doors by Ceco
Wood doors: Solid core wood doors by Oshkosh
Fire-control doors, security grilles: Overhead coiling doors by Mahon
Special doors (sound control, X-ray, etc.): Sound control (acoustical) doors by Security Metals
Hardware
Locksets: Best
Hinges: Select Products Limited
Closers: LCN
Exit devices: Von Duprin
Pulls: Rockwood Mfg. Co.
Security devices: By owner
Cabinet hardware: Blum
Interior finishes
Acoustical ceilings:
- Micro Climaplus by US Gypsum
- Tectum panels by Tectum
- K-13 Spray applied acoustical ceiling by International Cellulose
Suspension grid: Donn DX & AX grid by US Gypsum
Cabinetwork and custom woodwork: Brunt Associates Novi, MI
Paints and stains:
- Paints & high performance coatings by Sherwin Williams
- Anti-graffiti coating by Dumond Chemicals
- Wood floor finishes by Dura Shield
Plastic laminate: Nevarmar
Special surfacing: Epoxy terrazzo by TEC Spec Products, Inc.
Floor and wall tile: Dal Tile used in restrooms
Resilient flooring:
- ECOsurface Recycled rubber floor tile by Dodge-Regupol
- VCT by Armstrong
Carpet:
- Monterey hyperlink carpet by Monterey
- Prince St. straight grain carpet by Bently Prince St. Carpet
Furnishings
Auditorium seating: Irwin Seating Co.
Lockers: DeBourgh Mfg. Co.
Theatrical Rigging & Orchestra Shell Enclosure: SECOA
Laboratory metal casework: Mott
Foot grills: CS Group
Conveyance
Elevators/Escalators: Hydraulic and traction elevators by Schlinder Elevator Co.