Typical CASE 962D drawing review checklist
CASE
DRAWING REVIEW CHECKLIST
Project:
Project Manager:
Reviewer:
Project No:
Engineer:
Date:
I.
General Drawing Format
Item
Yes
No
N/A
Comment
A.
Is there a Project cover
sheet including:
1.
Name of Project?
2.
Address of Project?
3.
Design team and Contact
person?
4.
Scope of work
5.
Location and Project
Site Plan?
6.
Deferred Item List?
7.
List of Governing Codes?
8.
Drawing List?
B.
Do the sheet titles in
the Drawing Index match the individual drawing titles?
C.
Are the dates, commission
members, revision descriptions, and initials consistent
from sheet to sheet?
D.
Do title blocks appear
consistent between structural and architectural
drawings (project name, fonts, text size, drawing
numbering convention, etc)?
E.
Are drawing scales shown
correctly?
F.
Do plans show north arrow
for orientation?
G.
Are match lines shown
consistently from sheet to sheet
H.
Are match lines consistent
with locations shown on archtectural drawings
I.
Are structural plans
orientated to match archtectural drawings