|
Floral Street Bridge
London
Wilkinson Eyre Architects
Wilkinson Eyre has given Covent Garden
a symbol of artistic aspiration linking the Royal Ballet School
and the royal opera
© Nick Wood
|
For more photos click on 'photos
& drawings' above.
To see the people and products
behind this project click on 'people & products.'
|
By Sara Hart
In spite of its diverse practice, London-based
Wilkinson Eyre Architects has solidified its reputation internationally
as a designer of spectacular bridges. Its Floral Street Bridge
at Covent Garden is a fraction of the scale of its award-winning
Gateshead Millennium Bridge spanning the Tyne River, but just
as powerful.
Because the bridge spans a mere 30 feet
across an unassuming street in Londons Covent Garden,
one would assume that the program would call for a modest
functional footbridge connecting the back sides of two buildings.
But these arent just any buildings. Floral Street separates
the Royal Ballet School from the landmark Royal Opera House.
Ballet students, faculty, and staff of the school needed a
direct link to the stage of the opera house. The client wanted
a strong architectural statementone that would provide
an integrated link between the buildings while giving Floral
Street a prominent identity.
The openings between the buildings are
not aligned, making a straightforward orthogonal resolution
seem like a jerry-rigged collision between two architecturally
distinct structures. To avoid that trap, Wilkinson Eyre conceived
a deceptively simple, yet immediately legible design. An aluminum
spine beam supports a timber deck and a series of square aluminum
hoops. Between the openings, each hoop rotates 4 degrees relative
to its neighbor and shifts in plan to accommodate the skewed
alignment of the facade openings. The whole structure twists
a quarter turn from one end to the other.
Want the full story? Read the entire
article in our June 2004 issue.
Subscribe to Architectural
Record in print, or get Architectural
Record digitally.
Formal name
of Project:
Floral Street Bridge
Location:
London
Measurements:
Span: 31 feet
Total construction
cost:
$1.42 Million
Owner:
The Royal Ballet School
Architect:
Wilkinson Eyre Architects
Transworld House
100 City Road
London EC1Y 2BP
Tel: +44(0) 20 7602 7900
Fax: + 44(0) 20 7608 7901
email: info@wilkinsoneyre.com
www.wilkinsoneyre.com
|