home
subscribe
free e-newsletter free e-newsletter
reader service
widget
advertise
Subscribe to Architectural Record today
and save 60% off the newsstand price.
comment

Harvard University New College Theatre

Cambridge, Massachusetts
Leers Weinzapfel Associates

A historic building is renovated into a modern theater for Harvard students.

Harvard University recently acquired the 1887 Hasty Pudding Club building, formerly owned by the oldest society at Harvard, a secret society that transitioned into a theatrical group by the 1840s. One of the many design challenges was to honor the historical importance of the former Hasty Pudding Theatre, which features student-written works, while creating a performance space to meet the current standards of theater technology and audience comfort.

Harvard University New College Theatre
Photo © Alan Karchmer/Esto

Watch as Josiah Stevenson of Leers Weinzapfel Associates takes us on a tour of a historic Cambridge theater (home of the "Hasty Pudding" theatricals) his firm renovated and expanded.
Rate this project:
Based on what you have seen and read about this project, how would you grade it? Use the stars below to indicate your assessment, five stars being the highest rating.
----- Advertising -----

The original front third of the 1887 brick structure, together with entry porches, was retained and restored for multi-purpose use. The rear two-thirds of the building was rebuilt to create the new theater, a 6-story volume embedded beyond the building’s historic facade. The new building houses a full theater complex with rehearsal spaces, dressing rooms, offices, a control booth, and prop and scene shops.

In the 272-seat auditorium, deep crimson aniline-dyed plywood paneling and air diffusers lined with blue LED tubes create a bold, imaginative environment. Equipped with a moveable thrust stage, orchestra and stage lifts, and a comprehensive house and stage lighting system, the flexibility of the performance space is educationally useful.

Unique to the main stage are the windows along the side balcony that allow natural daylight in during rehearsal and group meetings. By night, the windows can be covered by operable shades for performances.

Along the south-facing wood-paneled wall, three panels open, permitting light from the main stairwell into the theater. The panel opening also provides access to light fixtures, and a rare position for performance above the stage.

An acoustically isolated multifunction room is located above the main auditorium and serves as a black-box theater, a main rehearsal room, a recital hall, a classroom, and a place for formal receptions.

The south porch of the original building, together with the adjacent alley, has become the new public theater entry. From the street, the transparent lobby of the new building allows passersby a glimpse to the interior of the new theater.

Formal name of project:
Harvard University New College Theatre

Location: Cambridge, Massachusettes

Gross square footage:
Addition – 28,000 sq.ft.
Renovation – 7,000 sq.ft

Completion Date: October, 2008

Owner: Harvard University

Architect:
Leers Weinzapfel Associates
75 Kneeland Street, Suite 301
Boston, MA 02111

share: more »

 Reader Comments:

Sign in to Comment

To write a comment about this story, please sign in. If this is your first time commenting on this site, you will be required to fill out a brief registration form. Your public username will be the beginning of the email address that you enter into the form (everything before the @ symbol). Other than that, none of the information that you enter will be publically displayed.

We welcome comments from all points of view. Off-topic or abusive comments, however, will be removed at the editors’ discretion.

----- Advertising -----
Reader Feedback
Most Commented Most Recommended
Rankings reflect comments made in the past 14 days
Rankings reflect comments made in the past 14 days
View all Record Blogs
View all
AR Selects: Project Blogs
View all Project Blogs
McGrawHill
Search