subscribe
free e-newsletter free e-newsletter
product info
advertise
FAQ
SUBSCRIBE TODAY
for premium web access
comment

In Dallas, Fate of Calatrava Bridge Hangs in Balance

September 28, 2009

By David Dillon

The first two sections of Santiago Calatrava’s Trinity River Bridge arrived in Dallas on August 20. Ordinarily this would have been cause for celebration, a sign that the project was on track and under control. But in this case it may be just one more round in a 10-year dog fight involving the city, the U.S. Army Corps of Engineers, and the Federal Highway Administration over where or whether the vehicular bridge can be built.

Calatrava-designed bridge
Image courtesy Santiago Calatrava LLC
Cost overruns, public opposition, and numerous federal reviews have stalled construction of a Calatrava-designed bridge.
Rate this project:
Based on what you have seen and read about this project, how would you grade it? Use the stars below to indicate your assessment, five stars being the highest rating.
----- Advertising -----

Calatrava got the commission in 1999, and in 2003 unveiled his final design, a steel and concrete span with a 300 foot parabolic arch in the center, costing an estimated $75 million. He described the bridge as a rare opportunity for Dallas to rediscover its river and to connect the developed and undeveloped parts of the city, specifically downtown and west Dallas.

Cost overruns, public opposition, and numerous federal reviews have slowed progress to a crawl. The latest blow was an April report from the Army Corp of Engineers declaring the Trinity River levees unsafe and incapable of withstanding a 100-year flood. The Corps found up to 25 feet of sand where supports for the bridge approaches would go, possibly compromising the entire structure.

The Corps is allowing construction of the bridge deck to proceed, but has halted all work on the approaches pending a review of the levers, which could take two years. All of this has left the future of the bridge—now christened the Margaret Hunt Hill Bridge—up in the air. Supporters have launched a major publicity campaign called “Suspense is Building,” and Dallas mayor Tom Leppert, a big booster, has promised that the bridge will open in 2011 as planned. Others are not so optimistic, citing the glacial pace of federal reviews. The bleakest prediction is for the bridge, and a related toll road, to open around 2016.  

The Hunt bridge is one of three Calatrava has designed for Dallas. The second is mostly funded, while the third is still virtual.

David Dillon is a contributing editor at Architectural Record.

share: more »

 Reader Comments:

Sign in to Comment

To write a comment about this story, please sign in. If this is your first time commenting on this site, you will be required to fill out a brief registration form. Your public username will be the beginning of the email address that you enter into the form (everything before the @ symbol). Other than that, none of the information that you enter will be publically displayed.

We welcome comments from all points of view. Off-topic or abusive comments, however, will be removed at the editors’ discretion.

----- Advertising -----
----- Advertising -----
McGraw-Hill Construction

Search Sweets

Example: Building Products, CAD, BIM, Catalogs
Search
Reader Feedback
Most Commented Most Recommended
Rankings reflect comments made in the past 14 days
Rankings reflect comments made in the past 14 days