subscribe
free e-newsletter free e-newsletter
product info
advertise
FAQ
SUBSCRIBE TODAY
for premium web access
comment

In Minneapolis, KPMB to Revamp Orchestra Hall

August 19, 2009

By David Sokol

Well before Herzog & de Meuron expanded the Walker Art Center and Jean Nouvel dreamed up a new Guthrie Theater, Minneapolis had been home to contemporary architecture.

In Minneapolis, Orchestra Hall, built in 1974, is getting a makeover designed by Kuwabara Payne McKenna Blumberg.
Photo courtesy Wikipedia
Orchestra Hall, built in 1974, is getting a makeover designed by Kuwabara Payne McKenna Blumberg.
Rate this project:
Based on what you have seen and read about this project, how would you grade it? Use the stars below to indicate your assessment, five stars being the highest rating.
----- Advertising -----

When Hardy Holzman Pfeiffer completed Orchestra Hall on the city’s Nicollet Mall in 1974, for example, the daringly stripped-down design rejected the privilege associated with traditional symphony spaces. In 2013 the building will portray a new interpretation of Modernism when an expansion overseen by Toronto-based Kuwabara Payne McKenna Blumberg (KPMB) opens to the public. The Minnesota Orchestral Association announced its selection of KPMB in June, culminating a seven-month-long international search process. 

Orchestra Hall is renowned for its 2,450-seat auditorium—a freestanding brick interior structure that features sound-reflecting cubes suspended from its ceiling and overall acoustics by Cyril Harris. “Unlike the performance hall, which has stood the test of time admirably, the public and support spaces are chronically in need of an overhaul,” says KPMB partner-in-charge Marianne McKenna. Currently the Orchestra Hall lobby can hold only 800 people, for example.

In addition to refreshing the concert hall, KPMB will rewrap it, emphasizing bolstered lobby space. The expansion will connect to, but not encroach upon, Peavey Plaza, an adjacent sunken public space that was completed by M. Paul Friedberg in 1975.  “The opportunity is to reconnect Orchestra Hall’s social spaces to Peavey Plaza, and to the dynamic of the city,” explains McKenna.  

Bruce Kuwabara says the firm’s recently completed Toronto works, such as the National Ballet School (2005), Gardiner Museum (2006), and Royal Conservatory of Music (2009), will inform the upcoming redesign. Currently KPMB is assessing the building’s existing infrastructure, which includes the massive air-intake and exhaust vents that punctuate the glass-brick-and-steel exterior. McKenna says these signature elements may be incorporated in the redesign, or shifted.

share: more »

 Reader Comments:

Sign in to Comment

To write a comment about this story, please sign in. If this is your first time commenting on this site, you will be required to fill out a brief registration form. Your public username will be the beginning of the email address that you enter into the form (everything before the @ symbol). Other than that, none of the information that you enter will be publically displayed.

We welcome comments from all points of view. Off-topic or abusive comments, however, will be removed at the editors’ discretion.

----- Advertising -----
----- Advertising -----
Sweets, Search Building Products
Search
Reader Feedback
Most Commented Most Recommended
Rankings reflect comments made in the past 14 days
Rankings reflect comments made in the past 14 days