Click on the slide show to view the top 10 projects.

LIST METHODOLOGY: These projects are ranked on the basis of hard construction costs (including labor and materials, but excluding equipment, land, and design fees). Construction for these projects started between January 1, 2013, and February 28, 2015. The data were collected by Dodge Data & Analytics.