Bernoulliborg
Completion Date: December 2007
Client: Rijksuniversiteit Groningen
Based on what you have seen and read about this project, how would you grade it? Use the stars below to indicate your assessment, five stars being the highest rating.
Program: A 139,000-square-foot academic center with offices, a library, classrooms, and a restaurant.
Design concept and solution: The Bernoulliborg building houses the mathematics and physics departments of Groningen University and Hanze Polytechnic. Due to time constraints and the flexible interior program requested by the client, the architects chose a steel load-bearing structure, which is exposed in both the interior and exterior design. The public functions—library, reception, and restaurant—are housed in the transparent ground-floor volume. Two inner courtyards admit natural light into the core of the building. On the exterior, the upper portion of the building is clad in blue semi-transparent glass.
Gross square footage:
139,000 sq. ft.
Total construction cost:
16 million Euro
Architect:
De Zwarte Hond
Groningen Rotterdam
The Netherlands
T: 010-2409030
F: 010-2409025
www.dezwartehond.nl
|
|
Get Architectural Record digital with free bonus content not found in the magazine!
Order back issues—complete your library!

